Building the World Wide Hydrogen Super
Highway...
|
Gallery ◊ ◊ ◊ ◊ ◊
◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ |
Federative Republic of BrazilRepublica Federativa do Brazil
Interstate Traveler estimated cost Estimated cost to integrate all Brazilian Rail Roads: Estimated Solar Grid on 29,295 Kilometers of Hydrogen Super Highway rail: Estimated Photo Voltaic performance: Estimated Total Solar Grid Performance: Estimated Annual Energy Production for 29,295 Km of rail (10 hours / day *
365) System would support a starting number of 58,590 Transports (2 every 1 Km) at 80 passengers each for a simultaneous passenger capacity of 4,687,200 people. Estimated Revenue on Transit fee of $0.05/minute/person >>> 4,687,200 * .05 = $234,360.00/minute or $14,061,600.00 / hour during rush hour. If system is full for only 7 hours a day and empty the rest, $98,431,200.00/day and $35,927,388,000.00/year. Therefore the ROI on $292B @ $35.9B/year = 8.15 years. ◊ Here is the link to the excellent (68 Page) Transcontinental HyRail-Agraplex integration proposal generated by the work of Mr. Renato Vieira. Church`s
Brasil Importação e Exportação Ltda Local Copy: Regions/SouthAmerica/Brazil/HyRail_agraplex.Renato.Vieira.pdf |
Send mail to
CompanyWebmaster
with questions or comments about this web site.
|