Republic of Iraq

 

Land Area: 438,317  sq km
Coastline: 58  km
Population: 28,945,569  people (2008 est)
Irrigated Land 35,250 sq km
Airports 104  
Pipelines    
Gas 2,501 km
LPG 918 km
Oil 5,032 km
Refined Oil 1,637 km
  24,829 km (combined estimate)
Railroads  (Standard Gauge) 2,272 km Total
     
Paved Roads 37,851  km (Total)  [23,505.4 Miles]
Unpaved Roads 7,049  km
Total Roadways 44,900  
National Electrical Demand 52 Billion kWh (2008 est)
     

Estimate for Building on 300 Miles

Interstate Traveler estimated cost  
$10 Million / Km   ($16 Million / Mile)

Estimated cost to integrate on 300 Miles of Road (482.79 Kilometers)
300 Miles * $16 Million / Mile = $4.82 Billion

Estimated Solar Grid on 300 Miles of Road
5,280 ft/mile * 16 feet in width = 84,480 sqft / mile
84,480 SqFt / Mile * 300 Miles = 25,344,000 Square Feet of Photo Voltaics

Estimated Photo Voltaic Performance
20 Watts / Square Foot / Hour

Estimated Total Solar Grid Performance on 300 Miles of Rail per hour:
25,344,000 * 20 = 506,880,000 Watts/Hour or about 506 Megawatts / Hour

Net Energy Production Estimated Annual Energy Production for 300 Miles of rail (8 hours / day *365)
506, 880,000 watts/hour * 8 = 4,055,040,000 watts / day * 365 = 1,480,089,600,000 watts / year
1.4 Billion kWh/year ( 16% of the National Energy Demand)

System would support a starting number of 900 Transports (3 every 1 Mile) at 80 passengers each for a simultaneous passenger capacity of 72,000 pedestrians.

Estimated Revenue on Transit fee of $0.05/minute/person >>> 72,000 * .05 = $3,600/minute or $216,000.00 / hour during rush hour.

Estimate on Total Railway Integration:

Interstate Traveler estimated cost  
$10 Million / Km

Estimated Commercial Value Cost to Build
$22.7 Billion  for 2,272 Kilometers (1,410.9 Miles)

Estimated Solar Grid on 2,272 Kilometers of HyRail:
3,280.83 ft/Kilometer * 16 feet in width = 52,493.28 Sqft/Kilometer
52,493.28 * 2,272 =  119,264,732.16 square feet of Photo Voltaic.

Estimated Photo Voltaic Performance:
20 Watt / Square Foot / Hour

Estimated Total Solar Grid Performance for 2,272 Kilometers of rail per hour:
119,264,732.16 * 20 = 2,385,294,643.2 Watts/Hour  (2.3 Megawatts per hour)

Net Energy Production Estimated Annual Energy Production for 2,272 Km of rail (8 hours / day * 365)
2,385,294,643.2 * 8 = 19,082,357,145.6 Watts/Day  * 365 = 6,965,060,358,144 Watts / Year
6.965 Billion kWh/Year   (13.4% of National Electrical Demand)

System would support a starting number of 6,816 Transports (3 every 1 Km) at 80 passengers each for a simultaneous passenger capacity of 545,280 people.  

Revenue on transit fee of $0.05/minute/person >> 545,280 * .05 = $27,264.00/minute or $1,635,840.00 / hour during rush hour.

If at capacity for only six hours a day and empty the rest, annual fare-box collection would be:
$1,635,840.00/hr * 6 = $9,815,040/day * 365 = $3,582,489,600 / year  ($3.5 Billion/yr)

Estimated ROI on Fare-box  22.7 / 3.5 = 6.48 Years

 