Cost
Range: $10-$20 Million / Mile (parallel track)
4800
tons of steel / mile (rail only)
85,000
square feet of PV / mile
~
1 Megawatt / mile / solar-hour
~
238 cubic meters of hydrogen / mile / hour
~
30 gallons of water / mile / hour (purification)
Self
sustaining 3-100 Transports Per Mile 24/7/365 (variable mass)
Standard
Installation includes:
3
Transports / 1 mile
2
Traveler Stations / 5 miles
1
ITC Utility Substation / 3 Miles