Building the World Wide Hydrogen Super
Highway...
|
Gallery ◊ ◊ ◊ ◊ ◊
◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ |
Republic of Iraq
Estimate for Building on 300 MilesInterstate Traveler estimated cost Estimated cost to integrate on 300 Miles of Road (482.79 Kilometers) Estimated Solar Grid on 300 Miles of Road Estimated Photo Voltaic Performance Estimated Total Solar Grid Performance on 300 Miles of Rail per hour: Net Energy Production Estimated Annual Energy Production for 300 Miles of
rail (8 hours / day *365) System would support a starting number of 900 Transports (3 every 1 Mile) at 80 passengers each for a simultaneous passenger capacity of 72,000 pedestrians. Estimated Revenue on Transit fee of $0.05/minute/person >>> 72,000 * .05 = $3,600/minute or $216,000.00 / hour during rush hour. Estimate on Total Railway Integration:Interstate Traveler estimated cost Estimated Commercial Value Cost to Build Estimated Solar Grid on 2,272 Kilometers of HyRail: Estimated Photo Voltaic Performance: Estimated Total Solar Grid Performance for 2,272 Kilometers of rail per hour: Net Energy Production Estimated Annual Energy Production for 2,272 Km of rail
(8 hours / day *
365) System would support a starting number of 6,816 Transports (3 every 1 Km) at 80 passengers each for a simultaneous passenger capacity of 545,280 people. Revenue on transit fee of $0.05/minute/person >> 545,280 * .05 = $27,264.00/minute or $1,635,840.00 / hour during rush hour. If at capacity for only six hours a day and empty the rest, annual
fare-box collection would be: Estimated ROI on Fare-box 22.7 / 3.5 = 6.48 Years |
Send mail to
CompanyWebmaster
with questions or comments about this web site.
|